Module Details

Module Code: MGMT C4G01
Module Title: BIM Management Process
Title: BIM Management Process
Module Level:: 7
Credits:: 5
Module Coordinator: Eoin Homan
Module Author:: Edward Lyons
Domains:  
Module Description: It is the aim of this module to equip practitioners with the requisite knowledge and tools to ensure that information is organized and controlled during the construction procurement process and throughout the lifecycle of the building, in a manner that is as efficient and supportive as possible, based on the exploitation and use of BIM models and tools.
 
Learning Outcomes
On successful completion of this module the learner will be able to:
# Learning Outcome Description
LO1 Evaluation of Model - Interact with, evaluate & interrogate BIM models to derive relevant 4D/5D/6D outputs using appropriate software tools. Insight into how BIM tools can be used throughout the building life cycle, beyond the design and documentation. Use BIM models to support construction techniques, construction planning, cost and quantity feedback, fabrication, and facilities management
LO2 Process/Collaboration - Learn and evaluate the interaction processes involved in designing, constructing and managing a building through use of BIM models and data sets, including the importance of collaborative working between disciplines nationally and internationally and influence/apply techniques and competencies to working collaboratively through BIM.
LO3 Management - Critically analyse and select BIM management techniques to achieve the desired deliverables/handover and performance outcomes, through project, facilities and operations management, taking into account their social and economic global impacts.
Dependencies
Module Recommendations

This is prior learning (or a practical skill) that is recommended before enrolment in this module.

No recommendations listed
Co-requisite Modules
No Co-requisite modules listed
Additional Requisite Information
No Co Requisites listed
 
Indicative Content
REVIT / BIM Technical
• The concept of through - 3D models,3D validation models,3D model take-off,3D digital survey models, BIM models maintenance,2D CAD drafting,2D CAD drawing from a 3D BIM model,4D/5D modelling plan drawings, Schedules, Room numbering diagrams, Colour filled diagrams, Bracing diagrams, Isometric building plans, Spool drawings, Employers Information Requirements (EIR), Project Information Requirements (PIR), Clash prevention,Clash detection reports, Visualisations: renders and animations,Virtual tours: walkthroughs, fly-throughs,BIM Execution plan (BEP), BS (PAS) 1192 — Parts 1 to 5 or BS ISO 19650, Classifications, Digital Plan of Work (describing level of detail — LoD/CIC Work Stages), Intelligent 3D libraries, Asset performance optimisation,COBie (Construction Operations Building Information Exchange)
BIM Implementation
• Building industry challenges and opportunities • The business value of BIM and integrated design • BIM deployment strategies • Design collaboration • Barriers to adoption • BIM for Contractors • BIM for Facilities Management • Lessons from early adoption
Module Content & Assessment
Assessment Breakdown%
Project100.00%

Assessments

Full Time

No Continuous Assessment
Project
Assessment Type Project % of Total Mark 100
Timing End-of-Semester Learning Outcomes 1,2,3
Non-marked No
Assessment Description
• Formative assessment given through one-to-one reviews/tutorials and group/class ‘crits’ & reviews
• Structured marking of projects as continuous assessment, involving allocation of marks for:

- Final drawings, details, specifications, schedules,
reports, presentations and posters 100%
No Practical
No End of Module Formal Examination
Reassessment Requirement
Coursework Only
This module is reassessed solely on the basis of re-submitted coursework. There is no repeat written examination.
Reassessment Description
Learners may submit additional project work for marking and the consideration of the Autumn Exam Board, providing they have achieved a minimum of 35% in their initial submission.

SETU Carlow Campus reserves the right to alter the nature and timings of assessment

 

Module Workload

Workload: Full Time
Workload Type Workload Category Contact Type Workload Description Frequency Average Weekly Learner Workload Hours
Lecture Contact No Description 12 Weeks per Stage 4.00 48
Estimated Learner Hours Non Contact No Description 12 Weeks per Stage 6.50 78
Total Weekly Contact Hours 4.00
 
Module Resources
Recommended Book Resources
  • Eric Wing. (2019), Revit 2020 for Architecture, SECOND. John Wiley & Sons, p.848, [ISBN: 111956008X].
  • Paul F Aubin. (2020), Revit Essentials for Architecture, G3b Press, p.808, [ISBN: 0578731061].
  • Elise Moss. (2021), Autodesk Revit 2021 Architecture Certification Exam Study Guide, SDC Publications, p.498, [ISBN: 1630573671].
  • ASCENT - Center for Technical Knowledge. Autodesk Revit 2021 Fundamentals for Architecture (Metric Units), [ISBN: 1952866006].
  • Rafael Sacks,Chuck Eastman,Ghang Lee,Paul Teicholz. (2018), BIM Handbook, John Wiley & Sons, p.688, [ISBN: 9781119287537].
  • Deepak Maini. (2018), Up and Running with Autodesk Navisworks 2019, Createspace Independent Publishing Platform, p.714, [ISBN: 1717554709].
  • Ascent -. Center For Technical Knowledge. Autodesk Navisworks 2020: Using Autodesk Navisworks in a BIM Workflow: Autodesk Authorized Publisher, [ISBN: 1951139305].
  • Simon Whitbread. (2015), Mastering Autodesk Revit MEP 2016, John Wiley & Sons, p.816, [ISBN: 1119059372].
  • Andrew Faulkner , Conrad Chavez. (2020), Adobe Photoshop Classroom in a Book 2020, 1st Edition. [ISBN: 0136447996].
  • Scott Onstott. Enhancing Architectural Drawings and Models with Photoshop, 2nd Edition. [ISBN: 0470916567].
  • Joe Habraken. (2010), Microsoft Office 2010 In Depth 1st Edition, 1st Edition. Que Publishing.
  • Dept of Environment., Technical Guidance Documents.
  • Brad Hardin,Dave McCool. (2015), BIM and Construction Management, John Wiley & Sons, p.416, [ISBN: 1118942760].
  • National Building Specification 2013, National BIM report 2013, www.thenbs.com/pdfs/NBS-NationlBlMReport2013-single.pdf.
  • HM Government Department for Business, Innovation and Skills 2011, BIM - A report for the Government Construction Client Group, : www.bimtaskgroup.org/wp-content/uploads/2012/03/BIS-BlM-strategy-Report.pdf.
This module does not have any article/paper resources
This module does not have any other resources
Discussion Note: